Client: Crann Support Group
Location: Navan, Co. Meath
Project: Childcare Facility / Greenfield Site
Size: 400 sq metres
Project Timeframe: 20 weeks
 
The Project:


Design & build contract for a 400 sq metre state of the art children facility. The contract included the full Greenfield site development. The new childcare facility promoted by the community opened its doors in May 2009 with capacity for 80 children.

The centre provides services aimed at kids from three months of age to 14-year olds, including breakfast, after-school activities, pre-school and full day care service. This project is based on the model used for the Coisceimeanna Childcare Centre in Trim that was opened in April 2008 by President Mary McAleese.

The centre includes two Afterschool rooms, a Waddler room (for 1-2 year olds), a Toddler room (for 3-5 year olds), a Montessori room with capacity of 20 children, a Nursery room (for 6-18 months), two Cot rooms, Nappy Changing area, kitchen and dining room, staff room, changing facilities as well as a reception and managers office.

Marie Daly, Regional Manager of the Crann Support Group:
“We found RoanKabin offers a more personal build, a more personal relationship,” explains Daly. “They attended every design meeting which made the process very smooth, as the people responsible for taking decisions all sat at the design table with the committee members.”“The main benefits of the buildings provided by RoanKabin are the fact that the building can be built in a much smaller timeframe, as well as significant difference in cost, compared to conventional commercial buildings.”

Offsite Manufacture:
The offsite manufacture of the building in our controlled factory environment allows for more efficient construction techniques & enables concurrent engineering as preliminary enabling & foundation works can be carried out simultaneously with the main building construction. The fact that the building envelope & first fix mechanical & electrical systems were constructed in the factory ensured further time savings were achieved over traditional or other system build types, i.e. precast concrete structures.

Unlike precast systems, where the walls, floors & roof must be fitted on site to the building taking weeks, RoanPlan offsite buildings can be weathered within four days. This enables the floor screed to be poured & set within 7 days of landing on site, thus expediting the programme further by allowing internal trades commence internal fitted out & second fixing faster.Time savings on the Navan project versus traditional methods were estimated in the region of 50%+ & 20%+ versus precast system methods.

Image Gallery:


(click image for larger view) (click image for larger view) (click image for larger view)

(click image for larger view) (click image for larger view) (click image for larger view)


Copyright © 2010 Roankabin ™ All Rights Reserved

Kildare: 045 886 100 | Waterford: 051 378 839 | Galway: 1890 500 369 | Cork: 021 486 6400

Home | Hire | Contact Us
Associations:

Roankabin, Old Milltown, Kill, Co. Kildare.
Kildare: 045 886 100 | Waterford: 051 378 839 | Galway: 1890 500 369 | Cork: 021 486 6400
Email: sales@roankabin.ie



Siteserv Group Companies:
RoanKabin Manufacturing Limited is registered in the Republic of Ireland (Company Registered Number (145851) and is part of the Siteserv Group of Companies (Registered Number 393096)

Registered Office: The Grange, Newcastle Road, Lucan, Co. Dublin
VAT Registration Number: IE 4692248M
 
Website Designed by: Web Creations