Grangegorman
PDF Brochure
(Approx 1.2 MB) |
|
| Client: |
Grangegorman D7 Educate Together |
| Location: |
Dublin 7 |
| Project: |
Two Storey, Sixteen Classroom School |
| Size: |
2,500 sq metres |
| Project Timeframe: |
16 weeks |
Requirement:
RoanKabin were awarded the contract to design
& build a purpose built two storey sixteen
classroom school building & complete development
of a green-field site. The new school building
compromised sixteenclassrooms, resource rooms,
multipurpose room, library, special needs room,
staff room, toilets & administrative offices. |
Solution:
Internal fit-out included partitioning, internal doors,
Marmoleum floor covering, gas fired central heating
system, telephone & data systems, PA systems and
full Department of Education & Science specification
mechanical & electrical fitout. Externally the building
was finished with large architectural windows &
a deep fascia giving the building a distinctly modern
feel.
RoanKabin were also responsible for the overall development
of the Greenfield site from foundations, car-parks,
perimeter fencing, play areas & landscaping. RoanKabin’s
experience & state of the art factory facilities
enabled the company complete the 2,500sq mtr project
in 16weeks. RoanKabin were able to manufacture &
fitout the core building in the factory, while simultaneously
developing the site.
Minister Sean Haughey opens Grangegorman school
Roankabin's Grangegorman Project has scored air test
rating of 4.38*. The new Educate Together school was
officially opened by Minister Sean Haughey recently.
According to current building regulations (Part L 2007)
'a performance level of 10m3/h/m2 represents a reasonable
upper limit for air permeability'. The Dept of Education
and Science has specified an upper limit for air permeability
of 5 m3/hr/m2 at 50 Pa, a far superior level than that
recommended in Part L. The Roankabin Building at Grangegorman,
when pressure tested, achieved an impressive result
of 4.3 m3/hr/m2 at 50 Pa which exceeds all requirements
and contributes greatly to the Energy Efficiency of
the school.
*0 is the best result and 10 is the standard value to
comply with building regulations.
Image Gallery:
|
 |
 |
| (click
image for larger view) |
(click
image for larger view) |
(click
image for larger view) |
|
|
 |
 |
| (click
image for larger view) |
(click
image for larger view) |
(click
image for larger view) |
|
|
|
|
|
 |
| Copyright
© 2010 Roankabin ™ All Rights Reserved |
Kildare: 045
886 100 | Waterford: 051 378 839 | Galway: 1890 500 369
| Cork: 021 486 6400 |
|
|
| Home
| Hire | Contact
Us |
|
Roankabin, Old Milltown, Kill, Co. Kildare. Kildare:
045 886 100 |
Waterford: 051 378 839
| Galway: 1890 500 369
| Cork: 021 486 6400
Email: sales@roankabin.ie |

| Siteserv
Group Companies: |
 |
 |
 |
 |
 |
 |
 |
|
RoanKabin Manufacturing Limited is registered in the
Republic of Ireland (Company Registered Number (145851)
and is part of the Siteserv Group of Companies (Registered
Number 393096)
Registered Office: The Grange, Newcastle Road, Lucan,
Co. Dublin
VAT Registration Number: IE 4692248M |
|
| |
| Website Designed
by: |
 |
Web
Creations |
|
|
|