Client: Our Lady's Hospital for Sick Children, Crumlin.
Location: Crumlin, Dublin 12
Project: Category 3 Laboratory
Size: 100 sq metres
Project Timeframe: 14 weeks
Architect: Robinson Keefe Devane (RKD)
Quantity Surveyor: Seamus Monahan & Partners

Requirement:

The Category 3 Laboratory formed part of the Hospital’s ongoing development programme & by late summer 2006, Our Lady's Hospital were searching for a supplier to help expedite the project.

Solution:

RoanKabin were awarded the design & build contract for the construction of the new Laboratory, Irelands first Off-site constructed Category 3 Laboratory. Build quality (a structural design life in excess of 60 years), a proven ability to deliver on a short timeframe & a strong working relationship with both the client & architect were all important factors in the appointment of RoanKabin as the contractor. As main contractor RoanKabin were also responsible for PSCS & PSDP. This highly specialised building required full clean room certification as part of the contract.

Scope of Works:

  • Civil works: reducing level, foundations, connection to services & links to main hospital building
  • Mechanical & Electrical fit-out
  • Medical Gases
  • Fire Detection & Suppression Systems
  • Extension of existing hospital heating systems
  • Partitioning
  • Suspended Ceilings
  • Air-conditioning/ extraction systems
  • Floor covering including coved skirting
  • Decoration
  • Project supervision of all contractors
  • Clean room certification

Innovative Solutions:

Ireland’s first off-site constructed modular building system. The off-site fitout of the Laboratory expedited the programme time greatly. The off-site construction of the building also greatly reduced the health & safety risk:

- Significantly reduces the number of vehicle movements on site
- Greatly reduced the threat of aspergillious by reducing the onsite construction elemen
t- Reduced working at height requirements

The 5 month programme timeframe was over 40% faster than that offered by traditional building methods. Precise project management by RoanKabin’s experience team ensured this ambitious target was achieved.

Image Gallery:

(click image for larger view) (click image for larger view) (click image for larger view)
(click image for larger view) (click image for larger view) (click image for larger view)

 

Copyright © 2010 Roankabin ™ All Rights Reserved

Kildare: 045 886 100 | Waterford: 051 378 839 | Galway: 1890 500 369 | Cork: 021 486 6400

Home | Hire | Contact Us
Associations:

Roankabin, Old Milltown, Kill, Co. Kildare.
Kildare: 045 886 100 | Waterford: 051 378 839 | Galway: 1890 500 369 | Cork: 021 486 6400
Email: sales@roankabin.ie



Siteserv Group Companies:
RoanKabin Manufacturing Limited is registered in the Republic of Ireland (Company Registered Number (145851) and is part of the Siteserv Group of Companies (Registered Number 393096)

Registered Office: The Grange, Newcastle Road, Lucan, Co. Dublin
VAT Registration Number: IE 4692248M
 
Website Designed by: Web Creations