Client: Beaumont Hospital
Location: Beaumont Road, Dublin 9
Project: Transition Lounge
Size: 300 sq metres
Project Timeframe: 9 weeks
Architect: Moloney O’Beirne
 

Requirement:

Additional ward space was required to relieve the pressure on the existing Accident & Emergency Department. Beaumont proposed a transit lounge/ ward to cater for the overflow. The Hospital appointed leading healthcare architects, Moloney O’Beirne, and began design work on the new ward.

Solution:

RoanKabin received an initial enquiry from the architects and was asked to undertake preliminary design work on the specification & layout of the building. The contract then went to public tender, which RoanKabin won, & the state-of-the-art RoanPlan Modular Building was chosen to house the new ten-bed ward. The building would be linked to the existing Accident & Emergency Department; RoanKabin was responsible for the breakthrough & alterations.

Architectural aluminium external cladding matched that of the main hospital creating a seamless finish. As main contractor RoanKabin were also responsible for PSCS & PSDP.Infection control is a critical issue when working in a live hospital environment, all site personnel were required to adhere to RoanKabin’s strict infection control policy.

The new 300sq mtr ward was constructed off-site & craned into position over the existing accident & emergency department. The lift & installation was completed in one day & was clad to blend in seamlessly with the main hospital. As infection control measure the link between the new department & the main Intensive Care Ward corridor was not broken through until the modular building was complete.

Scope of Works:
  • Civil works: reducing level, foundations, connection to services, links & alterations to main hospital building
  • Nurses call facility
  • Bed-head trunking
  • Extension of existing hospital heating systems
  • Partitioning
  • Floor covering including coved skirting
  • Decoration
  • Project supervision of all contractors
  • Cladding of exterior to match main hospital building

Innovative Solutions:

The complete off-site fitout of the ward expedited the programme time greatly. The off-site construction of the building also greatly reduced the health & safety risk:
- Significantly reduces the number of vehicle movements on site
- Greatly reduced the threat of aspergillious by reducing the onsite construction element
- Reduced working at height requirements

The 10 week programme timeframe was over 50% faster than that offered by traditional building methods. Precise project management by RoanKabin’s experienced team ensured this ambitious target was achieved.

Image Gallery:

(click image for larger view) (click image for larger view) (click image for larger view)
(click image for larger view) (click image for larger view) (click image for larger view)

 

Copyright © 2010 Roankabin ™ All Rights Reserved

Kildare: 045 886 100 | Waterford: 051 378 839 | Galway: 1890 500 369 | Cork: 021 486 6400

Home | Hire | Contact Us
Associations:

Roankabin, Old Milltown, Kill, Co. Kildare.
Kildare: 045 886 100 | Waterford: 051 378 839 | Galway: 1890 500 369 | Cork: 021 486 6400
Email: sales@roankabin.ie



Siteserv Group Companies:
RoanKabin Manufacturing Limited is registered in the Republic of Ireland (Company Registered Number (145851) and is part of the Siteserv Group of Companies (Registered Number 393096)

Registered Office: The Grange, Newcastle Road, Lucan, Co. Dublin
VAT Registration Number: IE 4692248M
 
Website Designed by: Web Creations